2025
November 2025 – demolishing of the old bungalow continues
October 2025 – a bit more demolition and then a break until late spring
September 2025 – moving Marj in!
Aug 2025 – Marj’s flat, workshop and balcony…
July 2025 – Marj’s flat and the staircase…
June 2025 – change of plan!
May 2025 – first fix downstairs
April 2025 – starting on completion
March 2025 – moving in!
February 2025 – second fix – shower tiling, electrics, painting…
January 2025 – more plaster boarding, plastering and….
2024
December 2024 – First fix. Plasterboard…
November 2024 – mvhr, studwork, doors, electrics, plumbing…
October 2024 – downstairs floor and starting studwork upstairs
September 2024 – Upstairs floor, wrong X, front doors.
August 2024 – electricity, roof, windows, bridge and upstairs flooring.
July 2024 – roof membrane, rooflights, windows and water supply prep
June 2024: roof construction, electricity supply and the tool of the year.
May 2024 update – finishing the Nudura walls and, hopefully, starting on the roof…
April 2024 – update
March 2024 – update – first floor slab build
February 2024
January 2024
2023
First slab pour…
22nd November update – slab prep
Nov 8 – drains going in
9.10.23: First Nudura in
19.10.23: Foundation wall pour
October 9 update – foundations pour
October 8 update – the day before the foundations are poured…
September (16th) update: Site levelled and strip foundation trenches started
July (19) update – lots of digging and more delay with planning approval.
Crusher day – part 1
June 2013 Pt. I: Outbuildings demolished
C2: Day 1: May 27 2023: site clearance
26.5.23: The day we got planning permission…
THE NEXT CHAPTER BEGINS…
March 2023: Hayter Lovers
March 2023: Culvercroft 2: the plans are in
Happy New Year
2022
It’s Christmas!
RIP Lilly 1994 to 2022
Prepping for Culvercroft II
Jerry
Culm meadow 2022
Tracy’s knew nee
2021
Storm #1
Time for the boys to have some toys
2020
Ralph + Jeff arrive
Giselle arrives
2019
The pools
Lilly arrives
Mungo arrives
Culm Meadow preparation
Sheeps
2018
In the beginning…
The Pool Shed
dark / light mode
Home
2023
June
June 2023
June 2013 Pt. II: 1st crusher day
Read More
June 2013 Pt. I: Outbuildings demolished
Read More
Home
THANK YOUS
DRAWINGS
2025
Show sub menu
November 2025 – demolishing of the old bungalow continues
October 2025 – a bit more demolition and then a break until late spring
September 2025 – moving Marj in!
Aug 2025 – Marj’s flat, workshop and balcony…
July 2025 – Marj’s flat and the staircase…
June 2025 – change of plan!
May 2025 – first fix downstairs
April 2025 – starting on completion
March 2025 – moving in!
February 2025 – second fix – shower tiling, electrics, painting…
January 2025 – more plaster boarding, plastering and….
2024
Show sub menu
December 2024 – First fix. Plasterboard…
November 2024 – mvhr, studwork, doors, electrics, plumbing…
October 2024 – downstairs floor and starting studwork upstairs
September 2024 – Upstairs floor, wrong X, front doors.
August 2024 – electricity, roof, windows, bridge and upstairs flooring.
July 2024 – roof membrane, rooflights, windows and water supply prep
June 2024: roof construction, electricity supply and the tool of the year.
May 2024 update – finishing the Nudura walls and, hopefully, starting on the roof…
April 2024 – update
March 2024 – update – first floor slab build
February 2024
January 2024
2023
Show sub menu
First slab pour…
22nd November update – slab prep
Nov 8 – drains going in
9.10.23: First Nudura in
19.10.23: Foundation wall pour
October 9 update – foundations pour
October 8 update – the day before the foundations are poured…
September (16th) update: Site levelled and strip foundation trenches started
July (19) update – lots of digging and more delay with planning approval.
Crusher day – part 1
June 2013 Pt. I: Outbuildings demolished
C2: Day 1: May 27 2023: site clearance
26.5.23: The day we got planning permission…
THE NEXT CHAPTER BEGINS…
March 2023: Hayter Lovers
March 2023: Culvercroft 2: the plans are in
Happy New Year
2022
Show sub menu
It’s Christmas!
RIP Lilly 1994 to 2022
Prepping for Culvercroft II
Jerry
Culm meadow 2022
Tracy’s knew nee
2021
Show sub menu
Storm #1
Time for the boys to have some toys
2020
Show sub menu
Ralph + Jeff arrive
Giselle arrives
2019
Show sub menu
The pools
Lilly arrives
Mungo arrives
Culm Meadow preparation
Sheeps
2018
Show sub menu
In the beginning…
The Pool Shed