July (19) update – lots of digging and more delay with planning approval.

July (19) update – lots of digging and more delay with planning approval.

Driveway leveled and in. Stables relocated. Driveway and car park covered with crushed stone from old outbuildings.

Main excavation now started – excavated soil/stone/clay going into mounds that will become the ‘devon banks’ that will form the hedgerow linking east and west boundaries.

Update: Found out on the 28th July that the new planning application required for the revised location were still being validated. (It should have been done in early June!). Now we have to wait until the end of September before we can begin the works proper.

Next Post

September (16th) update: Site levelled and strip foundation trenches started

Sat Sep 16 , 2023
Site more or less level and down to ‘reduced dig’ level. Dogs OK with it. Bedroom 1 marked out to make sure the Boss is happy with dimensions etc. We have approval. First trenches going in. Slow progress levelling the site in between all the rainy days but we have plenty of time on our […]